SPECT collimators,
built to OEM drawing.
Collimator assemblies for SPECT and gamma-camera platforms — parallel-hole, fan-beam, pinhole, and rectangular-hole geometries across the full low-, medium-, and high-energy range. Produced to the OEM detector format, mounting interface, and inspection criteria.
Where the collimator
sits.
Mounted at the inner face of each detector head, the collimator is the precision lens that defines what the gamma camera can see. Spatial resolution, sensitivity, and image geometry — each is set by its channel matrix, septa, and mounting interface, manufactured to the OEM detector format.
Geometry
portfolio.
Four standard geometries, each engineered for a different clinical question. Channel geometry, septa, and interface are manufactured to the customer drawing.
Parallel-Hole
The general-purpose SPECT geometry. Low, medium, and high energy across the diagnostic isotope range.
ViewFan-Beam
Converging-geometry optics for brain SPECT and small-organ acquisitions. To customer focal length.
ViewPinhole
Magnifying single-aperture optics for the highest spatial resolution on small targets.
ViewRectangular-Hole
Slot-channel geometries built to OEM detector pitch. High-sensitivity acquisitions.
ViewEnergy
classes.
Three principal classes, each defined by the gamma-ray energy it must stop. Customer terminology varies (LEHR, LEHRS, LEUHR, MEGP, MELP, HEGP, HEHR); underneath, three bands cover the full diagnostic and therapeutic isotope range.
| Class | Energy | Isotopes | Clinical use |
|---|---|---|---|
| LELow energy · LEHR / LEHRS / LEUHR / LEGP | 30 – 200 keV | ⁹⁹ᵐTc · ²⁰¹Tl ¹²³I · ¹¹¹In | General-purpose SPECT — bone, lung perfusion, brain, renal, cardiac. |
| MEMedium energy · MEGP / MELP | 200 – 400 keV | ⁶⁷Ga · ¹¹¹In ¹⁷⁷Lu · ¹²³I high-energy | Therapy monitoring, sentinel-node localisation, and infection imaging. |
| HEHigh energy · HEGP / HEHR | 350 – 600 keV | ¹³¹I · ¹⁸F theranostic isotopes | Post-therapy imaging, ¹³¹I scans, and emerging theranostic protocols. |
Discuss a
collimator program.
Send drawings, BOM, or a target specification. We will review feasibility, materials, and inspection criteria. Response within two business days.